





Project Info
Substructure: 7500 square meters Duration: 7 months
Description
1. Recycled material with high thermal resistance was used in the reconstruction of this building.
2. The old air conditioning system was replaced with a smart, energy-efficient HVAC system.
3. All exterior glass has been replaced with SMART GLASS, which becomes clear and opaque based on environmental conditions.
4. The smart sewage system was implemented.