




Project Info
Substructure: 7000 square meters Area: 800 square meters Duration: 20 months
Description
1. This building is designed and implemented based on low-consumption HVAC intelligent ventilation.
2. Maximum prevention of energy wastage and reduction of consumption as much as possible has been taken into account.
3. All windows have been replaced with 3-pane windows.
4. Bamboo panels have been used for the floors as well as part of the wall coverings.
5. The floor heating system has been implemented.